Carpentry invoice template for built-ins, joinery and repairs

A carpentry invoice template that bills custom woodwork in the units you quoted: by the foot run, by the piece or by the hour.

  • Built-ins by the run, doors by the piece
  • Timber and hardware supplied listed
  • Deposit and progress payments taken off
Free download

Enter your email and we send the file straight to your inbox.

Free, no accountSelectable text PDFUpdated

Carpentry invoice template for built-ins, joinery and repairs preview
Example only: business names and numbers are made up.

01What is a carpentry invoice template?

A carpentry invoice template bills custom woodwork in the units it was quoted in: cabinets and wardrobes by the foot run, doors and shelves by the piece, and repairs by the hour. It names the finish, records stage payments already made and shows the balance. Download it as Word, Excel or PDF, or open the Singapore sample in the generator.

Price
Free, no sign up
Formats
Online, Word, Excel, PDF
Designs
8, with your logo
Best for
Built-ins, joinery and repairs

02Anatomy

Eight parts of a carpentry invoice

Point at a number to see where each part sits. Miss one and the invoice waits in an inbox while someone asks for it.

Carpentry invoice invoice with its parts numbered
Example only: business names and numbers are made up.
  1. Your business detailsLogo, legal name, address and your GST registration number.
  2. Title and invoice numberA clear title and a unique number that runs in sequence.
  3. Client detailsThe client's legal name and billing address, plus their tax number for business sales.
  4. Dates and termsIssue date, payment terms and a real due date the client cannot misread.
  5. Lines the client can checkOne line per job, item or visit, with the quantity and price, and their PO number where they use one.
  6. Tax shown correctlyGST at 9% shown with the amount, so a registered client can claim it.
  7. Notes that stop questionsJob address, references and anything the client needs to approve it without emailing you.
  8. Amount dueThe total in a panel that stands out, with the due date beside it.

03Free tax calculator

Work out the tax before you invoice

Enter your price, choose where you bill, and see the exact tax lines your invoice should show. Nothing is saved or sent.

Where you bill
Rate

Invoice total

$10,583.90

Taxable value
$9,710.00
GST 9%
$873.90

Standard rates checked October 2026. Your goods or service may have its own rate, so confirm it before you invoice.

Put it on an invoice

Foot run, per piece and per hour

Built-in carpentry is usually priced by length. A foot run is one foot measured along the front of a cabinet or wardrobe, whatever its depth, so 12 feet of kitchen base cabinets is 12 foot run. Height changes the rate, which is why a full height wardrobe costs more per foot run than a base unit.

Items that do not run along a wall, such as a door, a study table or a set of floating shelves, are billed per piece. Small fixes, like rehanging a door or replacing hinges, suit an hourly rate with a minimum charge. Use whichever unit the quote used, line by line, so the customer can tick the invoice off against it.

Example lines on a carpenter invoice

Each line should say what was built, where, its unit and the finish. The figures below are examples in Singapore dollars before GST, chosen to show the format; materials, finish and site access all move the real price a long way.

ItemUnitExample rate (SGD)
Kitchen base cabinets, laminatePer foot run180
Kitchen wall cabinets, laminatePer foot run150
Full height wardrobe, swing doorsPer foot run280
Study table with drawer, built inPer piece650
Solid timber door, fittedPer piece380
Hacking and disposal of old cabinetsPer job450

Stage payments on a joinery invoice

Custom joinery is made to measure, so most carpenters take money in stages: a deposit when the design is confirmed, a payment when the carcasses are delivered or installed, and the balance after handover and touch ups. Each stage gets its own numbered invoice, and the last one shows the full picture.

On the final invoice, list the full contract items, then each payment received with its date: “Less deposit, 2 Sept, $2,900” and “Less second payment, 30 Sept, $4,350”. Changes agreed on site, such as an extra drawer or a different handle, go in as separate lines marked as additions. Our progress billing invoice template is laid out for this.

Singapore GST on a carpentry invoice template

IRAS sets GST at 9%. A GST registered carpenter must issue a tax invoice to GST registered customers within 30 days of the time of supply, with “Tax Invoice” shown prominently. A tax invoice is not required for customers who are not registered, such as homeowners, though you can still issue one.

  • Your name, address and GST registration number, the invoice number and date.
  • The customer’s name and address, a description of the work and the GST rate.
  • The total excluding GST, the GST amount and the total including GST.
  • For a total of $1,000 or less, including GST, a simplified tax invoice is allowed.

IRAS also requires GST registered businesses to quote prices to the public inclusive of GST. If you quoted a homeowner $7,000 including GST, set the tax to Included in the generator so the invoice total still reads $7,000. Our guide on what a tax invoice is compares the rules across countries.

Woodwork invoice mistakes to avoid

Most carpentry disputes are about length, finish or what counted as an addition. The fix is to write down measurements and materials at the time, not reconstruct them when the bill goes out. These are the slips that come up most often on woodwork invoices.

  1. Billing a different length from the quote without noting the site measurement that changed it.
  2. No finish named. Laminate, veneer and solid timber are priced differently; say which.
  3. Additions mixed into quoted lines. Keep them separate with the date agreed.
  4. Stage payments missing from the final invoice.

Using the carpentry template and generator

Download the carpentry layout from this page as Word, Excel or PDF. Or open the carpentry invoice maker with an office fit-out loaded, which sets Singapore and 9% GST, and replace the foot runs, pieces and finishes with your own.

Timber and laminate floors fit the flooring invoice, design fees for a full renovation sit on the interior design invoice template, and small repair visits suit the handyman layout. See every design on the templates hub.

Make it in the free generator

Fill it in on screen and download or email a real PDF. No sign up.

Open the generator

Questions, answered.

Short answers first. Something missing? Ask us.

What does foot run mean on a carpenter invoice?

A foot run is one foot of length measured along the front of a built-in item, such as a cabinet or wardrobe. The depth is not counted, and height is reflected in the rate. So 10 foot run of wall cabinets at $150 is $1,500 before tax.

How do I invoice a carpentry deposit?

Issue a numbered invoice for the deposit when the design is confirmed, describing it as a deposit against the contract. On later invoices, show the full contract and subtract each payment received with its date, so the balance on the final invoice matches what the customer still owes.

Should a carpenter charge for materials separately?

For built-ins priced by foot run, materials are usually included in the rate, and the finish is named in the description. For repair work billed by the hour, list timber, board and hardware separately so the customer sees what was bought for their job.

Do I need to issue a tax invoice to a homeowner in Singapore?

IRAS says a tax invoice is not required for customers who are not GST registered. You can still give one, or a receipt. Prices quoted to the public must include GST, so the amount on the invoice should match the GST inclusive figure the homeowner agreed to.

What is the difference between a joinery invoice and a carpentry invoice?

Joinery usually means items made in a workshop and brought to site, like cabinets, doors and windows, while carpentry often covers work built or fixed on site. The invoice layout is the same: item, unit, finish and price, with stage payments shown on larger jobs.